Welcome to ROSMASTER M3 PRO repository
11. OpenClaw active interaction
OpenClaw Active Interaction
OpenClaw Active Interaction1. Course ContentCourse OverviewPreparation2. Creating a New Skill3. Creating a Skill for Handling Special Situations4. Case Demonstration5. Extended Applications5.1 Equipment Fault Pre-warning and Handling5.2 Environmental Safety Monitoring5.3 Production Progress Tracking and Notifications5.4 Multi-Condition Composite Trigger Strategy
1. Course Content
Course Overview
- Based on "skills," you will write response strategies for specific scenarios, enabling OpenClaw to actively provide solutions when encountering unexpected situations.
- This section is a course on solution design tailored to specific application scenarios; therefore, you must first master the prerequisite courses: [OpenClaw Basics], [OpenClaw Interaction Methods], and [OpenClaw Skills Development].
Preparation
- First, complete the [OpenClaw Skills Development] course section to master the process of creating new skills.
- Launch the MicroROS chassis agent (if it is already running, do not launch it again).
xxxxxxxxxxsh start_agent.sh
- Launch nodes such as the odometry, TF, manipulator assistance, and camera nodes.
xxxxxxxxxxros2 launch m3pro_bringup car_base.launch.py- Launch the MCP service.
xxxxxxxxxxros2 launch m3pro_bringup mcp_service.launch.py

- If you require voice responses, you must additionally launch
openclaw_bridge; otherwise, this step may be skipped.
xxxxxxxxxxros2 run multi_brains_pre openclaw_bridge
2. Creating a New Skill
- Refer to the content in [OpenClaw Skills Development].
3. Creating a Skill for Handling Special Situations
xxxxxxxxxx---name: Production Line Material Shortage Handling Processdescription: When performing inspection tasks, provides a preset handling process for situations involving material shortages.version: 1.0.1---## Production Workshop Colored Material Shortage Handling Plan- Actively offers a solution to the user via a verbal inquiry; the corresponding response strategy will be executed only after explicit confirmation from the user.## Option 1: Replenish from the raw material warehouse shelves## Option 2: Proceed to the storage area and replenish using materials of the same specifications but a different color
- After creation is complete, restart the OpenClaw gateway for the changes to take effect
xxxxxxxxxxopenclaw gateway restart
4. Case Demonstration
[!NOTE]
- You may write the commands yourself according to your specific needs. The following serves as a case demonstration; you may choose any interaction method you prefer. Here, the WebChat interface is used as an example.


5. Extended Applications
OpenClaw's proactive interaction capabilities can be applied to a wide variety of scenarios. The following provides several reference examples for custom solutions:
5.1 Equipment Fault Pre-warning and Handling
xxxxxxxxxx---name: Equipment Anomaly Handling Processdescription: Proactively provides diagnostic and remedial suggestions when abnormal equipment operating parameters are detectedversion: 1.0.0---## Proactive Equipment Anomaly Warning Solution- Monitors equipment operating status in real-time; proactively alerts the user when anomalies are detected- Provides tiered handling suggestions: notifications for minor anomalies, and recommendations for immediate shutdown in cases of severe anomalies- Corresponding handling strategies are executed only after explicit confirmation by the user## Handling Option 1: Parameter Calibration- Verify the accuracy of sensor readings- Execute the equipment's self-diagnostic program- Calibrate deviation parameters## Handling Option 2: Shutdown and Maintenance- Immediately halt equipment operation- Notify maintenance personnel to report to the site- Log fault details for subsequent analysis5.2 Environmental Safety Monitoring
xxxxxxxxxx---name: Environmental Safety Monitoring Strategydescription: Proactively implements safety measures when environmental parameters exceed safety thresholdsversion: 1.0.0---## Proactive Environmental Safety Monitoring Solution- Continuously monitors environmental parameters such as temperature, humidity, and gas concentration levels- - Immediately issue an alert to the user upon detection of a hazardous situation- Provide emergency response protocols, requiring user confirmation before execution## Emergency Protocol 1: Ventilation and Air Exchange- Activate the exhaust ventilation system- Open doors and windows to facilitate airflow- Continuously monitor air quality until normal levels are restored## Emergency Protocol 2: Emergency Evacuation- Trigger the alarm system- Guide personnel to evacuate in an orderly manner- Contact professional emergency response agencies5.3 Production Progress Tracking and Notifications
xxxxxxxxxx---name: Proactive Production Progress Notificationsdescription: Periodically check the status of production tasks and proactively notify users at key milestonesversion: 1.0.0---## Proactive Production Progress Tracking Strategy- Periodically query the completion status of tasks on the production line- Proactively notify users at key milestones (e.g., material shortages, schedule delays, task completion)- Provide recommendations for next steps/actions## Notification Policies- Materials Nearing Depletion: Provide a replenishment reminder 2 hours in advance- Schedule Behind Plan: Analyze the root cause and offer recommendations for expediting work- Task Successfully Completed: Generate a completion report and notify relevant personnel5.4 Multi-Condition Composite Trigger Strategy
x---name: Intelligent Response to Composite Conditionsdescription: Combine multi-dimensional conditions—such as time, environment, and equipment status—to provide intelligent, proactive servicesversion: 1.0.0---## Multi-Dimensional Condition Response Strategy- Comprehensively analyze data from various sensors alongside business logic- Proactively trigger a response when a specific combination of conditions is met- Provide personalized recommendations for handling the situation## Trigger Condition Examples- Time Condition: During the night shift (22:00 – 06:00)- Environmental Condition: Temperature exceeds 35°C AND humidity falls below 30%- Equipment Condition: Continuous operation for more than 8 hours## Response Policies- Proactively recommend equipment downtime for maintenance- Alert staff members to potential environmental safety risks- Automatically adjust equipment operating parameters to an energy-saving mode